2021 Top Projects in Central Oregon

0

(Hanai | Photo courtesy of HD Architecture)

Cascade Business News is proud to share Central Oregon’s “Top Projects.” These projects were completed in 2021 and include new builds, remodels, expansions and tenant improvements.

To be included, local builders, developers, architects and engineers were asked to follow specific criteria. We look for projects within the tri-county area, finished in 2021 with a cost of $1 million or more. We realize there are many Top Projects that are under the $1 million mark and we would love to cover them throughout the year. If you have one you’d like featured in an upcoming CBN, please reach out!

Projects included are from a wide variety of industries, including health care, manufacturing, warehouse, restaurants, schools, pools and more. In all, these projects injected hundreds of millions of dollars into the Central Oregon economy.

Thank you!… To all of the architects, contractors, developers, engineers and others for helping CBN acquire and publish all of the information gathered for this edition.

We strive to publish every company involved in each project — from origin to excavation to finished carpentry. The teamwork, scheduling and all of the different skills it takes to complete projects on this scale is a testament to the true professionals we have working and living here in the high desert.

69 Newport

69 Newport Ave., Bend, OR 97701

Property Owner/Developer: Sean Cavanagh
Contractor:
R&H Construction
Square Footage:
East Building: 6,100 sq. ft., West Building: 6,400 sq. ft.
Senior Project Manager: Jacob Hartley R&H Construction
VP/Shareholder: Gary North, R&H Construction
Project Superintendent: Ryan Myhra, R&H Construction
Project Engineer: Rachael Schulte, R&H Construction
Structural Engineer: Ashley & Vance
Architect: Jim Landin, LRS Architects
Civil Engineer: Hickman Williams & Assoc.
Mechanical Engineer: Bend Heating & Sheet Metal Inc.
Landscaping: Aspen Landscape Development
Subcontractors and Suppliers:
7 Peaks Paving LLC, A&E Masonry & Construction, A-Core of Oregon LLC, Advanced Underground Utility Locating, Inc., Alpine Abatement Association, Inc, AM-1 Roofing Inc, Aspen Landscape Develop-ment, Baxter Builders, LLC, Bend Commercial Glass, Bend Concrete Service Co, Bend Electric Inc., Bend Heating & Sheet Metal Inc, Carlson Sign Co, Cascade Civil Corp, CCI Bend LLC, Ceniga’s Masonry, Central Oregon Garage Door, Dansky Cabinetry, Deschutes Painting Inc., Deschutes Window & Door Co Inc, Elite Construction Contracting, Energy Conservation Insulation Co., Fabulous Floors Inc, Guarantee Glass & Mirror Inc, H.A. McCoy Engineering & Surveying LLC, Havern Cabinetry Design, I & J Carpets Inc, Imagine Stoneworks Inc, Johnson Brothers TV & Appliance, Kaminski Construction LLC, Lakeview Mill-work Sales, Inc., LDC Inc, North Country Building Specialties, Northwest Quality Construction Inc, Out-west Builders LLC, Paulsen Environmental Consulting, Inc., Pavement Protectors Sweeping LLC, Performance Insulation & Energy Services Inc, Pioneer Millworks Inc, Portland Millwork, Inc, Revient LLC, Roger Langeliers Construction Co, Sage Window Cleaning, Severson Fire Protection Inc, Severson Plumbing & Mech Inc, Storlie Brothers Construction LLC, ThyssenKrupp Elevator, Tim Bloom Construction Inc, TURF Design Inc, We Cut Concrete Inc, Western Protective Coatings LLC
Brief Description of Project:
Development of two mixed-use commercial buildings, each measuring over 6,000 feet. The buildings feature liberal use of stone and steel but each has its own distinct characteristics. Each is two-story, featuring exposed beams and trusses, with restaurant amenities on the ground level and offices above.

Acme Construction Supply Co., Inc.

938 SW Page Ct., #101, Prineville, OR 97754

Property Owner/Developer: Chainring VII LLC/ Empire Construction & Development
Contractor: Empire Construction & Development
Sitework Start: October 2020
Completion: July 2021
Square Footage: 10,064 sq. ft.
Amenities: Distribution office and warehouse
Project Manager: Mark Meredith
Supervisor:
Mark Meredith
Architect:
Steele Associates Architects
Architect Team:
Adam Stephen, Danielle Burns, Scott Steele
Structural Engineer: Ashley & Vance Engineering
Civil Engineer:
Becon Civil Engineering
Mechanical Engineer:
Olson Heating
Landscaping:
Springtime Irrigation
Subcontractors and Suppliers:
Elite Electric, Sunset Plumbing, American Sprinkler,
Olson Heating, Springtime Irrigation
Brief Description of Project:
New light industrial distribution center for
Acme Construction Supply’s Prineville branch.

BASX Warehouse Expansion

3500 SW 21st Place, Redmond, OR 97756

Property Owner/Developer: BASX
Contractor: SunWest Builders
Sitework Start:July 6, 2020
Completion: May 15, 2021
Square Footage: 72,000 sq. ft.
Amenities:Manufacturing Warehouse with gantry cranes
Project Manager:Wayne Powderly
Supervisor: Tim Curry
Architect: Blaise Cacciola Architect
Principal Architect: Lisa Reynolds, Blaise Cacciola Architect
Structural Engineer: Ashley & Vance Engineering
Civil Engineer: Hickman Williams Engineering
Mechanical Engineer: Coffman Engineers
Geotechnical Engineer: Wallace Group, Inc.
Subcontractors and Suppliers:
Alex Hodge Construction, American Buildings, Anderson Clark Interiors, Inc., Apollo Mechanical, Ashley & Vance Engineering, Aspen Landscape Development, Baptista Tile, Barepaws – Testing, BASX Solutions, Bell Hardware, Bell Hardware – Bend, Bend Commercial Glass, Bend Concrete Services, Co., Bend Electric Inc., Blaise Cacciola Architect, Broken Top Window Coverings, Inc., C.H.I Companies, CS Excavation Carlson Sign, Cascade Civil Corp, Cascade Painting & Design, Inc., CCI Bend, LLC, Central Oregon Builders Association (COBA Prints) Central Oregon Redi-Mix, Classic Window Coverings, Coffman Engineers, Inc., Collins and Sons Excavating, Inc, Cox Custom Welding, Cutrite Concrete Cutting Daley Construction, Day Wireless, Eagle Roofing, ECI, Ei Dynamics Inc, Empire Stone Company, Erectors, Inc., Fabulous Floors, LLC, Forge Building Co., Garage Harmony, LLC, HD Fowler Company, Hickman Williams & Associates, HWA Inc., High Desert Steel Detailing LLC, Integrity Industries, LLC dba Cement El, J & R Fire Protection, J. Helm Enterprises, K & R Sheetmetal Inc, Kevin Spencer Masonry, Knife River, Konescranes, Marc Riverman Painting, LLC, Miller Lumber, Milwaukee Crane & Equipment, Morales VanBlokland Inc., Mountain Sky Landscaping, Inc., North Country Building Specialties, Northwest Framing Systems, OR Concrete, OverHead Door of Central Oregon, Redbuilt Engineered Wood Products, River Roofing Bend, LLC, Skyliner Print & Design, Stone Roofing & Construction, Inc., Sunburst Fabrications, Inc., SunWest Builders, Superior Garage Floors, ThyssenKrupp, Tri County Paving, Ultra Quiet Floors
Brief Description of Project:

72,000 sq. ft. pre-engineered metal building, manufacturing warehouse, gantry cranes.

Bend Factory Stores

61334 S Hwy. 97, Bend, OR 97702

Property Owner/Developer: NorthWest Asset Management Co.
Contractor: SunWest Builders
Sitework Start: September 28, 2020
Completion: June 15, 2021
Project Manager: Wayne Powderly
Supervisor: Todd Benson
Architect: BLRB Architects
Principal Architect: Emily Freed
Subcontractors and Suppliers:
Barepaws – Testing, Bend Commercial Glass, Carlson Sign, Cascade Disposal, Deschutes Window & Door, Dimar Siding Company,
Elite Electric, G2 Fire and Back Flow, Miller Lumber, NW Quality Roofing, Pacific Painting, Solid Rock Masonry Con.
Brief Description of Project:
Replacement of exterior envelope; new metal roofing, metal siding, new lighting, painting, new site concrete, brick pavers.

Bend International School Gymnasium

63034 OB Riley Rd., Bend, OR 97701

Property Owner/Developer: Empire Construction & Development
Contractor:
Empire Construction & Development
Sitework Start: February 2021
Completion:
December 2021
Square Footage:
7,180 sq. ft.
Amenities:
Basketball and volleyball courts with bleacher seating, music room, concessions and stage.
Project Manager: Mark Meredith
Supervisor:
Mark Meredith
Architect:
Steele Associates Architects
Architect Team:
Adam Stephen, Danielle Burns, Scott Steele
Structural Engineer: Ashley & Vance Engineering
Civil Engineer:
Becon Civil Engineering
Mechanical Engineer:
CEA Consulting Engineers
Geo Engineering:
Foundation Engineering, Inc.
Landscaping:
Springtime Irrigation
Subcontractors and Suppliers:
Elite Electric, Sunset Plumbing, American Sprinkler, Cascade Heating, Springtime Irrigation
Brief Description of Project:
New Gymnasium for the Bend International School, Bend La-Pine school district’s only K-8 Public Charter School dedicated to international education. This gives students a place for after school activities, P.E. class and rain/snow day recess indoors.

Bendistillery

19330 Pinehurst Rd., Bend, OR 97703

Property Owner/Developer: Bendistillery
Contractor: Trailhead Design + Build LLC
Project Cost: $2,300,000
Sitework Start:
October 2020
Completion:
Winter 2021
Square Footage:
17,230 sq. ft.
Amenities:
Loading dock, office, walk- in cooler and freezer, blending tanks, pasteurization equipment, canning line
Architect: BLRB Architects
Architect/Project Manager: Eric Nielsen
Principal Architect:
Seth Anderson, AIA, BLRB Architects
Project Manager: Jesse Krueger, Trailhead Design + Build LLC
Supervisor: Scott Briles, Trailhead Design + Build LLC
Structural Engineer:
Walker Structural Engineering, PC
Civil Engineer:
Hickman, Williams & Associates, Inc.
Mechanical Engineer:
CEA Consulting Engineers
Geotechnical Engineer:
Wallace Group, Inc.
Subcontractors and Suppliers:
Pacific Building Systems
Brief Description of Project:
Built to accommodate shipping, receiving, bottling, production and storage, this new building provides much needed space for Bendistillery to increase their storage and grow their production. In true Central Oregon fashion, the facility combines functionality with the beauty of our surrounding area. The new facilities are housed in a prefabricated metal building designed to complement the regions agricultural character. The production facilities feature ample glazing with northern views of the Cascades, as well as infrastructure for blending tanks, pasteurization equipment and a canning line. The storage space includes a loading dock, office and a walk-in cooler and freezer. A gabled roof has clerestory windows along the entire length of the building to provide natural light throughout. With this new building, Bendistillery will have a comfortable, highly functional space to accommodate their busy operations.

Caldera High School

60926 SE 15th St., Bend, OR 97702

Property Owner/Developer: Bend-La Pine Schools
Contractor: Kirby Nagelhout Construction Company
Project Cost: $116M
Sitework Start:
July 2019
Completion:
August 2021
Square Footage:
260,000 sq. ft.
Financing:
Capital construction bond
Project Manager:
Mike Lawrence, KNCC
Supervisor:
Alec Hansen, KNCC
Architect:
Kevin Shaver, BBT Architects
Principal Architect: Renée Alexander, BBT Architects
Structural Engineer: Walker Structural Engineering
Civil Engineer: DOWL
Mechanical Engineer:
PAE
Geotechnical Engineer:
Wallace Group, Inc.
Landscape Architect: Cameron McCarthy
Subcontractors and Suppliers:
ADPLemco Inc., Airline Louvers, Apollo Mechanical Contractors, Architectural Millwork Mfg., Bakko Backboards, Bar M Steel, Barclay Dean Architectural Products, Inc., Bell & Bell Builders Overhead Doors, Bell Hardware, Bell Installations, Bend Commercial Glass, Bend LaPine School District, Beynon Sports Surfaces, Inc., Bridgetown Sales, Broken Top Window Coverings, Inc., Carroll Construction Supply, Center Pointe Signs, Inc., Central Oregon Garage Door, Inc., Centric Elevator, No people are associated with Centric Elevator, Centric Elevator, Communications Technology Services, Convergint Technologies LLC, CRJ Construction Co., CTS-DAS, Curtis Restaurant Equipment, Inc., Cutrite Concrete Cutting Company, LLC, Daktronics, DBI, Delta A/V Systems, Inc., Delta AV, Deschutes Concrete Construction. Deschutes Painting, Inc., Do It Tennis, Doyles Manufacturing, Elevator Solutions, Inc., Elmers Flag & Banner, Inc., Energy Conservation Insulation Inc, Environmental Controls Corp, Ferguson Waterworks 1614, GH Surveying LLC, GVA NW LLC, Halliday Associates, Inc, Hallman Sales, Harry L. Stearns, Hilti, Huntco Supply, LLC, Hussey Seating, J & R Fire, LLC, J.R. Clancy Inc, Jack Robinson & Sons, Inc., Jay Battleson Design, Johnson Brothers Appliances, K&M Rebar, Kevin Spencer Masonry, Keystone Ridge Designs, Krieger Specialty Products, Lapeyre Stair, LDC, Inc., Len Hufford Construction, Lets Construction Cleaning Services, Inc., Listen Acoustics, Loading Dock Supply, Luma: Lighting Design, Made Of Steel, Inc., MAX Manufacturing, Mike’s Fence Center, Inc., Miller Lumber Company, Most Dependable Fountains, Inc., Nor-Pac Seating Co., Inc., Norkote, North Star Industries, Inc., Northwest School Equipment Inc., Old Mill Cabinets & Millwork, Olympian Precast, Inc., One-Electric, Pacific Cabinets, PBS Supply Co., Inc., PLA Designs, PNTA, Premier Builder’s Exchange, Procore Technologies, Inc., QEDLab, Rasmussen Masonry, Rasmuesen Masonry INC, Red Dog Fabrication, River Roofing – Bend, LLC, Rubenstein’s Contract Carpet, Safeguard Industries, Schonert & Associates, Inc., Schonert Tile, Inc, Scientific Environments, Inc., Shaw Sports Turf, Skyliner Print, Soriano Floor Finishing, Southern Bleacher Company, Inc., Sportafence, Sportsfield Specialties, Stoner Electric, Inc., Teufel Landscape, The Harver Company, Tomco Electric, Inc., Tri County Paving, Wenger Corporation, Wessco Waste & Recycling Equipment, Western Protective Coatings, WH Cress Company, Wilson Curb Inc., WJE
Brief Description of Project:
Provides a flexible, welcoming and innovative learning environment that prepares students to think critically and positively engage in society. The spaces thoughtfully reflect access and equity as core values, empowering each student to interact purposefully with each other and their communities.

Canal Commons Phase 1

21190 Thornhill Ln., Bend, OR 97701

Property Owner/Developer: Pacific Crest Affordable Housing
Contractor: SunWest Builders
Project Cost: $10.9M
Sitework Start: September 30, 2019
Completion: December 4, 2020
Square Footage: 56,000 sq. ft.
Amenities: Quantity two, three-story, 24- unit low-income apartment buildings, total of 48 units, wood framed. One community building with common space, management office and exercise room. Plus 560 LF of new city street.
Financing: First Interstate Bank
Project Manager: Kristy Thompson
Supervisor: Tim Curry
Architect: Jim Landin, LRS Architects
Principal Architect: Jim Landin
Structural Engineer: Ashley & Vance
Civil Engineer: Ashley & Vance
Mechanical Engineer: ColeBreit Engineering
Plumbing Engineer: CEA Consulting Engineers
Geo Engineering: Carlson Testing & Engineering
Landscape Design: Wintercreek Restoration
Landscaping: Wintercreek Restoration
Subcontractors and Suppliers:
Alex Hodge Construction, AM-1 Roofing Inc., Anderson Clark Interiors, B2 Concrete Construction, Baxter Builders, Bell Hardware, Bend Commercial Glass, Bend Concrete Services, Bend Electric Inc., Big Mountain Gutters, Cascade Painting & Design, CCI Bend, LLC, Central Oregon Trim & Door, Central Oregon Waterproofing, Custom Plus Heating, Daniel Simmons Contracting, Diamond Concrete Products, Fabulous Floors, Garage Harmony, High Desert Aggregate, J&R Fire Protection, Johnson Brothers Appliances, Lakeview Millwork Sales, Miller Lumber, North Country Building Specialties, Northwest Laundry Supply, Shamrock Northwest Construction, Sig Pro, Solid Rock Masonry, Sunburst Fabrication, Superior Garage Floors, Teck Plumbing, True Line Steel, Tye Engineering & Surveying, Ultra Quiet Floors, Western Protective Coatings, WinterCreek Restoration
Brief Description of Project:
Quantity two, three-story, 24-unit low-income apartment buildings, total of 48 units, wood framed. One community building with common space, management office and exercise room. Plus 560 LF of new city street.

Deschutes County Courthouse Renovation

1100 NW Bond St., Bend, OR 97703

Property Owner/Developer: Deschutes County
Contractor: Kirby Nagelhout Construction Company
Project Cost: $1.26M
Completion: August 19, 2021
Square Footage: 4,632 sq. ft.
Amenities: Increased security, accessibility and modernized the space.
Financing: Public
Project Manager: Lee Randall, Deschutes County
Architect: Pinnacle Architecture
Specialty Courthouse Consultant: KMB Architects
Structural Engineer: Ashley & Vance Engineering
Mechanical Engineer: CEA Consulting Engineers and MDA Engineers
Environmental: Paulsen Environmental Consulting
Subcontractors and Suppliers:
About the Grout Tile, LLC, Alpine Abatement Associates Inc., Anderson Clark Interiors Inc., Bell Hardware of Bend, Inc., Deschutes Painting Inc., Eagle Roofing Co, Fabulous Floors LLC, Joni’s Construction Cleaning, Kirby Nagelhout Construction Co., Lyon Holdings Inc DBA Bend Commercial Glass, Max Manufacturing, The Harver Company, Tomco Electric Inc.
Brief Description of Project:
The 1977 Deschutes County courtrooms were outdated, and the skylights were failing. The Pinnacle + KMB team was retained to renovate and modernize three of the four courtrooms in the Deschutes County Courthouse. Upgrades to acoustics, lighting, technology, seating and millwork updated the space. New skylights are a central design feature in each room. The upgraded LED lighting is tuned to match the natural light from the skylights. More rigid materials in the front of the courtrooms better project the sound to carry to the back of the gallery. Reformation of the seating and millwork allows more space for staff and responds to today’s court processes. One of the client’s goals was to improve accessibility. Between designing better flow and larger openings at the jury boxes and witnesses stand, the space is now accessible by all. Security improvements include a slightly higher railing between the audience gallery to delay an individual who may charge at participants to give court security more time to respond. “It was a complete success,” said Wells B. Ashby, presiding judge of Deschutes County Circuit Court.

District 2 East Building 4 — Stifel

2731 NW Potts Ct., Bend, OR 97703

Property Owner/Developer: Taylor Development & Brooks Resources
Contractor: SunWest Builders
Sitework Start: February 2020
Completion: January 2021
Square Footage: 4,425 sq. ft.
Amenities: Office space, conference room, breakroom and outdoor patio/ balcony
Project Manager: Kristin Burris
Supervisor: David Mata
Architect: Steele Associates Architects
Architect Team: Adam Stephen, Danielle Burns, Scott Steele
Structural Engineer: Froelich Engineers
Civil Engineer:
AKS Engineering
Mechanical Engineer:
CEA Consulting Engineers
Geo Engineering:
Wallace Group
Landscape Designer: Homeland Design
Subcontractors and Suppliers:
Elite Electric, CCI Bend, Quality Heating, Cascade Cabinets, J&R Fire, Guarantee Glass & Mirror & Christensen Plumbing
Brief Description of Project:
New branch location for Stifel in District 2 East’s Northwest Crossing campus on Bend’s westside.

District 2 East Building 5 — T.I.

2739 NW Potts Ct., Bend, OR 97703

Property Owner/Developer: Brooks Resources & Taylor Development
Contractor: SunWest Builders
Sitework Start: March 2021
Completion: November 2021
Square Footage: 6,220 sq. ft.
Amenities: Speculative office space
Project Manager: Kristin Burris
Supervisor:
David Mata
Architect:
Steele Associates Architects
Architect TeamL
Adam Stephen, Danielle Burns, Scott Steele
Structural Engineer: Froelich Engineers
Civil Engineer:
AKS Engineering
Mechanical Engineer:
CEA Consulting Engineers
Geo Engineering:
Wallace Group
Landscape Designer: Homeland Design
Subcontractors and Suppliers:
Elite Electric, CCI Bend, Quality Heating, Cascade Cabinets, J&R Fire, Guarantee Glass & Mirror & Christensen Plumbing
Brief Description of Project:
Two new speculative office suites in District 2 East’s Northwest Crossing campus on Bend’s westside.

Hanai

62430 NE Eagle Rd., Bend, OR 97701

Property Owner/Developer: Hanai Foundation
Contractor: Leader Builders
Project Cost: $2,800,000
Sitework Start: June 2019
Completion: September 2021
Square Footage: 4,000 sq. ft.
Amenities: Biophilic design, natural daylighting, radiant heat, advanced framing, flower of life structural harmony, living wall.
Financing: Owner
Architect: HD Architecture, Inc.
Designer: Piper Lucas Design
Principal Architect: Gary A. Holbrook
Structural Engineer: Eclipse Engineering, Inc.
Civil Engineer: Hickman Williams & Associates
Mechanical Engineer: CEA Consulting Engineers
Electrical Engineer: CEA Consulting Engineers
Landscaping: Katrina Langenderfer LA
Subcontractors and Suppliers:

Jim Hansen Construction, CWC Construction, Metolius River Plumbing, Kronsberg Electric, Jed’s Woodworking, McKenzie Cascade Excavation, True Line Steel, Sierra Pacific Windows, Bend Heating, WhiteStar Stucco, JL’s Drywall, Cost Less Carpet, Watchdog Security, Classic Window Coverings, Botanical Developments, McPherson Painting, Weld Design Studio.

Hayden Homes Amphitheater

344 SW Shevlin Hixon Dr., Bend, OR 97702

Property Owner/Developer: William Smith Properties
Contractor: R&H Construction
Sitework Start: December 2020
Completion:
June 2021
Project Manager:
Kyle Hartley
Superintendent:
Matthew Butler
Architect:
Open Concept Architecture
Structural Engineer: Clark Reder Engineering
Civil Engineer: HWA, Inc.
Subcontractors and Suppliers:
A-Core of Oregon LLC, Advanced Entry & Automation LLC, Advanced Underground Utility Locating, Inc., Alpine Abatement Association, Inc, AM-1 Roofing Inc, CCI Bend LLC, Deschutes Painting Inc., Elite Electric, LLC, Hickman, Williams & Assoc Inc, LETS Construction Cleaning, Inc., Mark Latham Excavation Inc, Northwest Quality Construction Inc, OR Concrete Inc, Severson Plumbing & Mech Inc, Staging Dimensions, Inc., Sunburst Fabrications Inc., Tri-County Paving Inc., Western Protective Coatings LLC,
Brief Description of Project:
Phase I of the multi-phased remodel of newly renamed Hayden Homes Amphitheater included breaking down the previous stage and rebuilding a new 62-foot steel stage on the existing platform, along with accessibility enhancements. The new stage provides an additional 1,840 sq.ft. to the total stage footprint and hosts a minimalist design with architectural accents in recognition of Bend’s sawmill history.

High Desert Industrial — Building #5

NE Fourth St., Bend, OR 97701

Property Owner/Developer: High Desert Bend, LLC
Contractor: Dominion Construction
Sitework Start: January 2021
Completion: December 2021
Square Footage: 14,500 sq. ft.
Amenities: High-lift overhead doors, mezzanines
Project Manager:
Zach Raab
Supervisor: Paul Glaunert
Architect: STEELE Associates Architects
Architect Team: Andy Harmon, Matt Sjoblom-Chambers, Scott Steele
Structural Engineer: Froelich Engineering
Civil Engineer: HWA
Mechanical Engineer:
JET Industries
Geotechnical Engineer: Wallace Group, Inc.
Landscape Design: Homeland Design
Brief Description of Project:
Multi-tenant Light Industrial building in new modern industrial campus on NE Fourth Street in Bend, featuring natural lighting, high-lift overhead doors and mezzanines in each suite.

High Desert Industrial — Building #7

NE Fourth St., Bend, OR 97701

Property Owner/Developer: High Desert Bend, LLC
Contractor: Dominion Construction
Sitework Start: June 2019
Completion: October 2021
Square Footage: 26,700 sq. ft.
Amenities: High-lift overhead doors, motorized in-floor dock levelers
Project Manager:
Zach Raab
Supervisor: Paul Glaunert
Architect: STEELE Associates Architects
Principal Architect: Andy Harmon, Matti Sjoblom-Chambers, Scott Steele
Structural Engineer: Froelich Engineering
Civil Engineer: HWA
Mechanical Engineer: JET Industries
Geotechnical Engineer: Wallace Group, Inc.
Landscape Design: Homeland Design
Brief Description of Project:
Multi-tenant Light Industrial building located in a modern industrial campus on NE Fourth Street in Bend, featuring natural lighting, high-lift overhead doors and motorized dock levelers in each suite.

Juniper Elementary School Addition

1300 NE Norton Ave., Bend, OR 97701

Property Owner/Developer: Bend-La Pine Schools
Contractor: Kirby Nagelhout Construction Company
Project Cost: $2.9M
Sitework Start:
May 2020
Completion:
August 2021
Square Footage:
12,600 sq. ft.
Financing:
Capital construction bond
Project Manager:
Mike Lawrence, KNCC
Supervisor:
Pete Showers, KNCC
Architect:
Nathanael Werner, BBT Architects
Principal Architect: Renée Alexander, BBT Architects
Structural Engineer: Eclipse Engineering
Civil Engineer:
HWA
Mechanical Engineer:
PAE
Landscape Architect:
J Battleson Design
Subcontractors and Suppliers:
A-Game Courts, American Sprinklers, Anderson Clark Interiors, Apollo Sheet Metal, Arizona Courtlines, Bend Commercial Glass, Bend Heating & Sheet Metal Building Material Specialties, CCI Bend Central Or Garage Door, Central Oregon Roofing, Central Oregon Waterproofing, David Tisiot, Deschutes Painting, Environmental Controls Corp, Fabulous Floors, Insulpro, Kevin Spencer Masonry, Lakeview Millworks Sales, Lets Const Cleaning Services, Mckenzie Cascade Heavy Excavation, Mountain Sky, North Rim Electric, Pence Kelly Concrete, RC Building Specialties, Redmond Fence & Pole Structures, Van Nevel Concrete & Curb, Western Wood Structure
Brief Description of Project:
This project focused on the addition of a new gymnasium that would enhance the school’s ability to provide spaces specific to instruction. The project also focused on security upgrades around the campus, enhancing the main entry and providing its first accessibility pathway to all six buildings across a very sloped site. New boilers were installed for the campus-wide steam mechanical system and snowmelt system on all pedestrian pathways.

Juniper Swim and Fitness Indoor Pool Renovation

800 NE Sixth St., Bend, OR 97701

Property Owner/Developer: Bend Parks and Recreation
Design Build Contractor: Pence Construction
Project Cost: $3,150,000
Sitework Start:
January 4, 2021
Completion: September 3, 2021
Square Footage: 11,680 sq. ft.
Amenities:
New pool tanks (Lap pool and children’s pool) and complete replacement of pool mechanical system
Project Manager:
Karl Nottelmann
Supervisor:
Brian Hudspeth
Architect:
Barker Rinker Seacat
Principal Architect: Daniel Matoba and Andy Stein
Structural Engineer: Miller Consulting Engineers
Electrical Engineer:
AE Design
Mechanical Engineer:
Ballard Group
Aquatic Design:
Water Technology Institute
Subcontractors and Suppliers:
Wilson Curb, CEM Aquatics, Oregon Cascade Plumbing, EC Electric, Webfoot Painting, Whitestar Plastering and Stucco, Sunburst, Bend Commercial Glass, Roedel Tile, Mike’s Fencing, Joni’s Cleaning, Severson Fire Protection
Brief Description of Project:
The project included a progressive design build delivery method which included the use of a Myrtha Renovaction panel system, liner and gutter components to replace the pool vessels, all new concrete decks and drainage. Project also included a complete replacement of the pool mechanical systems and electrical service gear.

Larkspur Community Center

1600 SE Reed Market Rd., Bend, OR 97702

Property Owner/Developer: Bend Park and Recreation District
Contractor: Pence Construction
Project Cost:
Construction: $18,500,000; Overall: $23,000,000
Sitework Start: April 1, 2019
Completion: August 31, 2020
Square Footage: New Construction: 34,000 sq. ft., Remodeled Sr. Center: 14,000 sq. ft.
Amenities:
Indoor walk/jog track, indoor pool with shallow depth pool, current channel, spa, lap pool; fitness center, group exercise rooms, private changing rooms and locker rooms, classrooms, lobby café
Financing: Funded by property taxes saved by district as well as system development charges to respond to community growth.
Project Executive:
Philip Johnson, Pence Construction
Sr. Project Manager: Cory Loomis, Pence Construction
Project Manager: Karl Nottelmann, Pence Construction
Superintendent: Leon Methvin, Pence Construction
Superintendent: Paul Sturges, Pence Construction
Project Engineer: Ever Calderon- Valverde, Pence Construction
Development Manager: Brian Hudspeth, BPRD
Architect:
Barker Rinker Seacat Architecture
Principal Architect: Daniel Matoba, Barker Rinker Seacat Architecture
Senior Associate:
Andy Stein, Barker Rinker Seacat Architecture
Aquatics Design:
Water Technology Inc.
Structural Engineer:
Miller Consulting Engineers
Civil Engineer: Hickman, Williams & Associates (HWA)
Mechanical Engineer: Glumac
Geotechnical Engineer:
Wallace Group, Inc.
Landscaping Design: Cameron McCarthy
Kitchen Design:
Clevengber Associates
Testing Agency:
Carlson Testing
Subcontractors and Suppliers:
Tye Engineering, Deschutes Concrete, Conseal, Cenigas Masonry, Sunburst Fabrications, Straight Up Carpentry, Garage Harmony, Bell Hardware, Anderson Clark Interiors, Insulpro, LDC, Platinum Exteriors, Central Oregon Roofing, Central Oregon Garage Door, Won-Door Corp, Bend Commercial Glass, Cascade Commercial Interiors, Whitestar Enterprises, Roedel Tile, Brandsen Floors, Direct Flooring, Empire Painting, JP Painting, Sign Wizards, WH Cress, BMS, Joni’s Cleaning, Curtis Restaurant Equipment, NW Playground, MLS Interior, Anderson Poolworks, Otis Elevator Company, Severson Fire Protection, Black Diamond Plumbing, Cascade Heating and Specialties, Bend Electric, Latham Excavation, Wilson Curb, High Desert Paving, Pavement Protectors, Botanical Developments
Brief Description of Project:
State-of-the-art fitness center, 135,000-gallon indoor swimming pool, 5,000-square-foot warm-water pool with a current channel incorporating a hydro feature, bubble benches, soft walk bottom and an adjacent hot tub, 6,000-square-foot fitness center upstairs, including surrounding walk/jog track, state-of-the-art equipment, features alcoves for functional workouts and small group training. Two flanking dedicated fitness rooms complete with mirrors, bars, fitness equipment, audio systems and a maple sprung floor and wheelchair elevator style lift for pool access. Many smart elements were incorporated to support sustainability into the building.

Legacy Landing

2065 NE Tucson Way, Bend, OR 97701

Property Owner/Developer: Housing Works
Contractor: R&H Construction
Sitework Start: June 2020
Completion:
November 2021
Square Footage:
48,000 sq. ft.
Sr. Project Manager:
Jacob Hartley
Superintendent:
Jim Stewart
Architect:
LRS Architects, Inc.
Principal Architect:
Jim Landen
Structural Engineer:
Ashley & Vance Engineering, Inc.
Civil Engineer: Ashley & Vance Engineering, Inc.
Mechanical Engineer: CEA Consulting Engineers
Landscaping: Aspen Landscape Development
Subcontractors and Suppliers:
97 Painting, LLC, A&E Masonry & Construction, A-Core of Oregon LLC, Aspen Landscape Development, Baxter Builders, LLC, Bend Commercial Glass, Bend Electric Inc., BrandSafway Services LLC, Central Oregon Heating & Cooling Inc, Central Oregon Waterproofing, Cleaning Unlimited, Deschutes Concrete Construction, Dimar Siding, Dorman Construction Inc., Fabulous Floors Inc, Gradeline Inc., Guarantee Glass & Mirror Inc, Heniges Construction LLC, Hickman, Williams & Assoc Inc, Hudspeth Land and Water LLC, J Helm Enterprises Inc, Johnson Brothers TV & Appliance, Kaminski Construction LLC, Lakeview Millwork Sales, Inc., McDermott Fence & Construction Inc, Mid-Valley LLC, North Country Building Specialties, Northwest Quality Construction Inc, Old World Cobblestone Inc, Pacific Rim Sash & Door, LLC, Performance Insulation & Energy Services Inc, Pro Shop Millwork & Design, River Roofing Bend, LLC, River Roofing Bend, LLC, Severson Fire Protection Inc, Severson Plumbing & Mech Inc, Sign Wizards Inc., Storlie Brothers Construction LLC, Sunbelt Rentals, Inc., ThyssenKrupp Elevator, Timber Canyon Construction LLC, Truss Components of Oregon Inc, Ultra Quiet Floors, US Mailboxes, Van Nevel Concrete & Curb Inc, Vernam Crane Services Inc, West Coast Tub Repair, Central OR Division, Western Protective Coatings LLC
Brief Description of Project:
Partnering with Housing Works and LRS Architects, this three-over-one podium mixed-use project includes three stories of multifamily affordable housing and a 14,000 sq. ft. Mosaic Medical healthcare clinic and pharmacy on the ground floor. The new space provides 47 one- and two-bedroom apartment homes for low-income seniors within the Central Oregon community. Six apartment units have been set aside for qualifying patients of Mosaic Medical with chronic medical conditions that create barriers for independent living. Four apartments are available to previously homeless senior veterans who are working with the Veterans Affairs VASH program. Legacy Landing has been awarded the Earth Advantage Platinum Multifamily certification.

MyMD

695 NW York Dr., Bend, OR 97703

Property Owner/Developer: MACPAC2 LLC
Contractor: CS Construction
Project Cost: $2,200,000
Sitework Start: January 2020
Completion: January 2021
Square Footage: 9,000 sq. ft.
Amenities: Medical office/exam space and tenant space for lease
Project Manager: Matt Freeman
Architect: Blaise Cacciola Architect
Principal Architect: Blaise Cacciola
Structural Engineer: Walker Structural Engineers
Civil Engineer: Hickman, Williams & Associates, Inc.
Mechanical Engineer: CEA Consulting Engineers
Geotechnical Engineer: Wallace Group, Inc.
Landscaping: Botanical Developments
Subcontractors and Suppliers:
AM-1 Roofing, Inc., Bend Commercial Glass, Carlson Sign Inc., Cascade Heating & Specialties, Inc, Grizzly Mountain Excavation, LLC, National Construction Rentals, Inc., Severson Fire Protection, Inc., Severson Plumbing, Ultra Quiet Floors, TK Elevator Corporation, Botanical Developments, JKD Construction, Inc, Moye’s Drywall Inc., Fabulous Floors, Inc., Broken Top Window Coverings, Elite Electric, LLC, Energy Conservation Insulation Co., Inc., Anderson Clark Interiors, Vazquez Painting and Construction LLC, Final Touch Cleaning by Gracie, KG Manufacturing LLC, Ceniga’s Masonry Inc, Miller Lumber, Hooker Creek Construction Materials, Builders First Source, Red Built, LLC, Premier Building Systems, Precision Truss, KG Manufacturing, LLC, North Country Building Specialties
Brief Description of Project:
Two-story, 8,600 sq. ft. new medical office building and the new home for the concierge medical practice of MyMD and Dr. Richard MacDonell.

Partners In Care Hospice House

2075 NE Wyatt Ct., Bend, OR 97701

Property Owner/Developer: Partners In Care
Contractor: SunWest Builders
Project Cost: $520 per sq. ft.
Sitework Start: Excavation/paving/ parking lot: February 2020, broke ground: June 2020
Completion: October 2021
Square Footage: 14,840 sq. ft.
Amenities: 12 private patient suites, garden, play areas, chapel, meeting room, commercial kitchen, family kitchenette, spa, off-leash pet park and more.
Financing: None
Project Manager: Jim Barrett, Partners in Care Representative
Project Supervisor: Jon Paige, SunWest Builders
Architect: Cole Architects
Project Architect: Kimberly Stroup
Interior Design Architect: ALSC Architects
Structural Engineer: Coffman Engineers
Civil Engineer: PARAMETRIX, INC.
Geotechnical Engineer: Wallace Group, Inc.
Mechanical & Electrical Engineer: Coffman Engineers
Landscape Architect: JBattleson Design
Subcontractors and Suppliers:
Absolute Signs & Apparel, Architectural Millwork Mfg Co., Architectural Specialties Inc., Baptista Tile, Barclay Dean Architectural Products, LLC, Bargreen Ellingson, Bell Hardware – Bend, Bend Concrete Services, Co., Bend Fireside, Inc., Bend Window Treats, Inc., Black Sheep Paper Hanging, Botanical Developments, Inc., Cascade Civil Corp, Cascade Heating & Specialties, Cascade Painting & Design, CCI Bend, Central Oregon Trim & Door, Christensen Plumbing Solutions, Custom Tint, Dave Gerhardt Tile, Dimar Siding Company, Eagle Roofing, Energy Conservation Insulation (ECI), Elite Electric, Engineered Products, EZ Way, Inc., Fabulous Floors, Gary’s Vacuflo, Geraghty Plumbing & Mechanical, H.A. McCoy Engineering & Surveying, J&R Fire, J&C Sanders Construction Supply, K&R Sheetmetal, Inc., Lakeside Lumber, LDC, Inc., Manciu Construction, Maxwell Construction, Mike’s Fence Center, North Country Building Specialties, Northwest Framing Systems, Overhead Door of Central Oregon, Precision Glass Service, Pro Shop Millwork, Quality Truss, Redbuilt Engineered Wood Products, Roger Langeliers Construction, Sealtech, LLC, Sierra Pacific Windows, Solid Rock Masonry, Superior Interiors, Inc., Tri County Paving, Trio Furniture & Design, True Line Steel, Vic Russell Construction, Western Protective Coatings, Won-Door Corporation
Brief Description of Project:
Features 12 suites with abundant natural light, homelike furnishings and amenities, space for family members to stay overnight. Private rooms feature tall windows that open, views of natural rock formations and native plants. Chapel complete with floor-to-ceiling windows, water feature with infinity edge and more.

Phoenix Crossing

1475 NE Forbes Rd./2065 NE Tucson Way, Bend, OR 97701

Property Owner/Developer: Housing Works
Contractor: R&H Construction
Sitework Start: June 2020
Completion:
September 2021
Square Footage:
18,500 sq. ft.
Project Manager:
Meghan Bowman
Superintendent:
Andy Hewes
Architect:
LRS Architects, Inc.
Principal Architect: Jim Landen
Structural Engineer: Ashley & Vance Engineering, Inc.
Civil Engineer:
Ashley & Vance Engineering, Inc.
Mechanical Engineer:
CEA Consulting Engineers
Landscaping:
Aspen Landscape Development
Subcontractors and Suppliers:
7 Peaks Paving LLC, A-Core of Oregon LLC, Alex Hodge Construction, AM-1 Roofing Inc, American Direct, Aspen Landscape Development, Baxter Builders, LLC, Bend Concrete Service Co, Bend Electric Inc., Bend Excavating LLC, CCI Bend LLC, Deschutes Painting Inc., Elite Construction Contracting, Energy Conservation Insulation Co., Fabulous Floors Inc, Ferguson Enterprises Inc.^, Guarantee Glass & Mirror Inc, Heniges Construction LLC, Hickman, Williams & Assoc Inc, Hudspeth Land and Water LLC, Lakeview Millwork Sales, Inc., LDC Inc, LETS Construction Cleaning, Inc., Masonry Resource Inc., McLean Concrete Construction, North Country Building Specialties, Northwest Framing Systems Inc, Otis Elevator Co, Pacific Rim Sash & Door, LLC, Pro Shop Millwork & Design, Redmond Fencing & Pole Structures LLC, Severson Fire Protection Inc, Severson Plumbing & Mech Inc, Sign Wizards Inc., Stephen’s Heating & Cooling Inc., Sunburst Fabrications Inc., True Line Steel Inc, Ultra Quiet Floors, US Mailboxes, West Coast Tub Repair, Central OR Division, Western Protective Coatings LLC
Brief Description of Project:
Adding to the much-needed housing shortage in Bend, R&H partnered with Housing Works and LRS Architects to build this ground-up 18,500 sq. ft. three-story, wood-framed, mixed-use affordable housing development with two floors consisting of 24 studio and one-bedroom homes dedicated to survivors of domestic violence through Saving Grace. The ground floor houses 5,000 sq. ft. of commercial retail space.

Prineville Industrial — Lot 3

111 SW Empire Dr., Prineville, OR 97754

Property Owner/Developer: Empire Construction & Development
Contractor: Empire Construction & Development
Sitework Start: March 2021
Completion:
December 2021
Square Footage:
21,825 sq. ft.
Amenities:
Light industrial speculative shell space
Project Manager: Mark Meredith
Supervisor:
Mark Meredith
Architect:
Steele Associates Architects
Architect Team:
Adam Stephen, Danielle Burns, Scott Steele
Structural Engineer: Ashley & Vance Engineering
Civil Engineer:
Becon Civil Engineering
Geotechnical Engineer:
Wallace Group, Inc.
Mechanical Engineer: Olson Heating
Landscaping:
Springtime Irrigation
Subcontractors and Suppliers:
Elite Electric, Sunset Plumbing, American Sprinkler, Olson Heating, Springtime Irrigation
Brief Description of Project:
Two new pre-engineered speculative buildings for light industrial tenant space in Prineville.

Prineville Water Treatment Plant

1432 Main St., Prineville, OR 97754

Property Owner/Developer: City of Prineville
Contractor: SunWest Builders
Sitework Start: July 13, 2020
Completion: June 15, 2021
Square Footage: 10,000 sq. ft.
Amenities: City Water Treatment Plant
Project Manager: Wayne Powderly
Supervisor: Mike Maxham
Architect: Odell Engineering
Principal Architect: Lee Odell
Structural Engineer: Jackola Engineering
Mechanical Engineer: Odell Engineering
Subcontractors and Suppliers:
AM-1 Roofing, Inc., Apollo Mechanical, Barepaws – Testing, Bell Hardware, Bend Commercial Glass, Cascade Painting & Design, Inc., CCI Bend, LLC, Dana Signs, ¬¬Davidson’s Masonry, Dimar Siding Company, Fabulous Floors, LLC, Hamer Electric, Havern Cabinetry Design, Marc Riverman Painting, LLC, North Country Building Specialties, Northwest Framing Systems, Oregon Truss, OverHead Door of Central Oregon, Pence/Kelly Concrete, LLC, Sealtech, LLC
Brief Description of Project:

10,000 sq. ft. water treatment plant.

Reserves at Pilot Butte Apartments

610 NE Dalton St., Bend, OR 97701

Property Owner/Developer: Bend Dalton Leasehold, LLC
Contractor: R&H Construction
Project Cost: $14,000,000
Sitework Start: February 2020
Completion: December 2021
Square Footage: 118,127 sq. ft, 82 units
Amenities: Outdoor BBQs, fire pit, off-leash dog park, dog wash station, in-building garages, carports, covered bike racks, electric vehicle (EV) charging stations and more.
Financing: Privately financed
Architect: BLRB Architects
Project Manager: Nicholas Radon, AIA, Architect, BLRB Architects
Structural Engineer: Ashley & Vance Engineering, Inc.
Civil Engineer: Hickman, Williams & Associates, Inc.
Mechanical Engineer: CEA Consulting Engineers
Geotechnical Engineer: Wallace Group, Inc.
Building Envelope: Morrison Hershfield
Owner’s Rep: deChase Miksis/Redpoint
Property Management: Cushman & Wakefield
Landscape Architect: SZABO Landscape Architecture, LLC
Land Use Consultant: Blackmore Planning and Development Services, LLC
Special Inspections: Carlson Testing, Inc
Subcontractors and Suppliers:
Elite Electric (electrical design/build subcontractor and engineer), Severson Plumbing & Mechanical, Inc., (plumbing design/build subcontractor and engineer), Baxter Builders, LLC, J&R Fire, LLC, Latham Excavation, Cascade Heating & Specialties, Inc., Deschutes Construction Corporation, 97 Painting, Sunburst Fabrications, Inc., AM-1 Roofing, Inc., Dimar Siding Company, CCI Bend, LLC, Floor Solutions, LLC, Eldorado Stone Corporation, Prime Window Systems, LLC, Woodtone, Sign Wizards Inc., Lanz Cabinets Multifamily Solutions, Imagine Stoneworks, Steelport, LLC, Precision Truss & Lumber, Inc.
Brief Description of Project:
Project includes an array of indoor and outdoor amenities including outdoor BBQ, firepit, off-leash dog park and pet wash station, hiking at nearby Pilot Butte, indoor fitness center. Finished complex will include four walk-up style apartment buildings and amenity building. Each apartment building includes 20-to-22 one- and two-bedroom units. Convenient location to shopping, medical, restaurants and outdoor recreation.

Roam

10 NW Minnesota Ave., Bend, OR 97703

Property Owner/Developer: Oxford Hotel – Baney Corporation
Contractor: Owner performed
Sitework Start: March, 2021
Completion: September, 2021
Square Footage: 2,000 sq. ft.
Amenities: Full Bar, lounge, booth seating, outdoor seating, outdoor radiant heating, operable indoor-outdoor glass sectional doors, dumbwaiter, private dining and conference room.
Principal Architect: Scott Steele
Project Manager: Chris Thome
Architect: Tristan Shepherd
Supervisor: Oxford Corporate — Bret Matteis
Interior Design: Oxford Corporate — Michelle Rispoli
Restaurant Design: Coastline Design
Structural Engineer: Ashley & Vance Engineering
Electrical Engineer: TOMCO
Mechanical Engineer: ATP Engineering, Inc.
Subcontractors and Suppliers:

Tomco Electric, Ponderosa Builders, CCI, Central Oregon Garage Door, Bend Heating, Beam Works, Bend Painting, JT Plumbing, Pro Shop, Bend AV, Bend Commercial Glass, Dan Daley, Phoenix Fire Protection, A-Core concrete cutting.
Brief Description of Project:

Roam is a new street access restaurant in the Oxford Hotel. The space was previously a ground floor lease space, which, through an extensive remodel, is now dually connected to the hotel lobby and accessible from the sidewalk entrance. A new glass door connects the restaurant to a new reservable dining area that can be used for both dinner parties and business meetings with full AV accessibility. The “back-of-house” services are now accessible through the rear stair corridor that connects the restaurant to the original Ten Below kitchen. The basement kitchen was also expanded to better serve the new restaurant, while also providing a new section dedicated for large banquets. Large operable glass sectional doors create an open-air dining experience during nice weather. Additional sidewalk seating with radiant overhead heating extends the outdoor dining season. The interior concept is modern industrial with a nod to local ranch life. The material and finishes palette embodies natural colors and hues found in the high desert. Materials include local Oregon reclaimed Juniper, wood beams from Bend company, Beam Works, painted brick, industrial steel windows and doors, custom steel and glass screens, textured plaster walls and concrete-like floor tiles. Artwork in the space reflects local mountains, juniper trees and wild horses. A custom horseshoe sculpture by a local artist uses horseshoes from the owner’s ranch.

Shevlin Wellness — Building #2

2165 NW Shevlin Park Rd., Bend, OR 97701

Property Owner/Developer: Taylor Brooks LLC/ Taylor Development
Contractor: SunWest Builders
Sitework Start: March 2021
Completion: December 2021
Square Footage: 5,234 sq. ft.
Amenities: medical office space
Project Manager: Kristen O’Riordan
Supervisor: David Mata
Architect: Steele Associates Architects, LLC
Architect Team: Chris Thome, Scott Steele
Structural Engineer: Ashley Vance
Civil Engineer: AKS
Mechanical Engineer: CEA
Landscape Designer: Homeland
Landscaping: Botanical Developments
Subcontractors and Suppliers:
Anderson Clark Interiors, Bell Hardware, Platinum Exteriors, Deschutes Plumbing, ECI, Fabulous Floors, Guarantee Glass & Mirrors, J. Helm Enterprises, JKD Construction, North Country Building, Northwest Framing, Pacific Painting, Quality Heating, Redbuilt, River Roofing Bend, Solid Rock Masonry, Superior Garage Floors, Tomco Electric, True Line Steel, Central Oregon Trim and Door
Brief Description of Project:
Single-story 5,234 sq. ft. office medical building designed for one or two tenants in the Shevlin Wellness Campus. The building will have one tenant, with 13 exam rooms, waiting area, three-offices, nurse station, medical assistant area, restrooms and break room. A lot of natural light is brought into the building with an East window wall and high transoms into interior exam rooms.

Sunlight Solar Energy, Inc.

150 NE Hawthorne Ave. (Sunlight Solar Building), Bend, OR 97701

Property Owner/Developer: Paul Israel, Sunlight Solar Energy, Inc.
Contractor: Sunlight Solar Energy, Inc.
Project Cost: $2,000,000
Sitework Start: November 15, 2019
Completion: October 31, 2021
Square Footage: 13,000 sq. ft.
Amenities: Solar powered, exceeded State energy codes, EV chargers.
Financing: Columbia Bank
Project Manager: Paul Israel
Supervisor: Robert Johnson
Architect: Stemach Design + Architecture
Principal Architect: Ellen Hassett
Structural Engineer: Vector Engineering
Civil Engineer: LB Engineering
Mechanical Engineer: CEA Consulting Engineers
Geo Engineering: WTI Testing and Design
Landscape Designer: Suzanne Audette Design
Landscaping: OrganiScapes, Inc.
Subcontractors and Suppliers:
Miller Lumber, Qtrusses, Innotech Windows, Applegate Insulation, Sunlight Solar Energy, Inc.
Brief Description of Project:
Net-zero solar-powered commercial building. Building exceeds Oregon commercial code. Grounbreaking mini-splits in a commercial building. Triple-glazed tilt-and-turn windows. Designed to enhance neighborhood community by having building proud and accessible to the street. Labor of love.

Tetherow HOA Pool

19259 Outrider Loop, Bend, OR 97702

Property Owner/Developer: Tetherow HOA
Contractor: SunWest Builders
Sitework Start: March 1, 2020
Completion: May 15, 2021
Amenities: Swimming pool, restrooms, parking lot
Project Manager: Wayne Powderly
Supervisor: David Mata
Architect: Darren Thomas Architects
Principal Architect: Darren Thomas
Civil Engineer: Parametrix Engineering Mechanical Engineer:
Geotechnical Engineer: Wallace Group, Inc.
Landscape Architect: Mike Szabo
Subcontractors and Suppliers:
Anderson Clark Interiors, Inc., Bell Hardware, Bell Hardware – Bend, Bend Concrete Services, Co., Bend Electric Inc., Bend Heating & Sheetmetal, Inc., Cascade Civil Corp, Cascade Painting & Design, Inc., Central Oregon Waterproofing, Cox Custom Welding, Daniel Simmons Contracting, Inc. Dave Gerhardt Tile, Deschutes Plumbing, East Cascade Security, ECI, Frame to Finish, Grizzly Mountain Excavation, J. Helm Enterprises, K & R Sheetmetal Inc, Mike’s Fence Center, Miller Lumber, Mosaic Medical, North Country Building Specialties, Northwest Framing Systems, Sealtech, LLC, Solid Rock Masonry Con., Specialized Pool Services, Stephen’s Heating & Cooling, Stone Roofing & Construction, Inc., Sunburst Fabrications, Inc., Sweeney Plumbing, Timber Canyon Construction, Tomco Electric, Inc.
Brief Description of Project:
New neighborhood swimming pool, restrooms and parking lot.

The Cove Aquatic Center

17605 Center Dr., Bend, OR 97707

Property Owner/Developer: Sunriver Resort
Contractor: R&H Construction
Sitework Start: November 2019
Completion:
May 2021
Square Footage:
10,000 sq. ft.
Project Manager:
Jason Duckowitz
Superintendent:
John Burris
Architect:
ALSC Architects, COLE Architects
Principal Architect: Andrew Leeper
Structural Engineer: Eclipse Engineering
Civil Engineer:
Parametrix
Mechanical Engineer:
Coffman Engineers
Landscaping:
JBattleson Design
Electrical Engineer:
Coffman Engineers
Subcontractors and Suppliers:
7 Peaks Paving LLC, A-Core of Oregon LLC, Advanced Underground Utility Locating, Inc., Anderson Clark Interiors Inc, Anderson Pool Works, Bargreen Ellingson Inc, Bend Commercial Glass, Carlson Sign Co, Cascade Heating & Specialties, Inc, CCI Bend LLC, CutRite Concrete Cutting, LLC, Deschutes Painting Inc., Dust B Gone Cleaning Services LLC, Elite Electric, LLC, Energy Conservation Insulation Co., Fabulous Floors Inc, J Helm Enterprises Inc, LDC Inc, McLean Concrete Construction, Mid-Valley LLC, Mike’s Fence Center Inc, North Country Building Specialties, Old World Cobblestone Inc, Overhead Door/Central Oregon, Parametrix Inc, Pavement Protectors Sweeping LLC, RC Building Specialties LLC, Redmond Welding & Contracting, Resist All Seamless Gutters LLC, Robinson & Owen Heavy Construction, Inc., Severson Fire Protection Inc, Severson Plumbing & Mech Inc, Smalling Construction, Inc., Spring River Tree Service, Inc., Springtime Irrigation Inc, Stone Roofing & Construction, INC., Summit Lockers, Sunburst Fabrications Inc., Superior Garage Floors, LLC, Tri-County Climate Control, LLC
Brief Description of Project:
Completed as an expansion to Sunriver Resort’s existing Cove pool, the Aquatic Center project includes a ground-up indoor pool facility adjacent to the resort facility. This 10,000 s.f. building hosts a large swimming pool, lazy river, waterslide, children’s splash pad and indoor access to the Spotted Frog poolside restaurant. Three sides of the building feature roll-up garage doors, allowing the facility to transform into a roofed outdoor park in the summer. The 12,000 s.f. outdoor event yard features trees and native plants that create privacy around the community green space available for hosting events. New parking, drive aisles and bike/walk paths have been added throughout the expansion. The Cove Aquatic Center offers guests of Sunriver Resort an exclusive oasis where they can relax and enjoy pool amenities year-round.

The Grove at Northwest Crossing

2838 NW Crossing Dr., Bend, OR 97703

Property Owner/Developer: Grove NWX, LLC, Chris Jones
Contractor: SunWest Builders
Project Cost: $8.6M
Sitework Start:
December 2019
Completion:
March 2021
Square Footage:
13,780 sq. ft. Market Hall and 18,200 sq. ft. Commercial Building
Amenities:
Market Hall: ten restaurant stalls, common indoor and outdoor eating areas with large fire place and fire pits. Commercial Building: build-to-suit office, retail and restaurant spaces. Includes covered parking, shared restrooms/shower and lockers.
Financing:
First Interstate Bank
Project Manager:
Julie Hyer
Supervisor:
Jim Skelly
Architect:
Hacker Architects
Principal Architect: Tom Schmidt
Structural Engineer: SCE Engineering
Civil Engineer:
Adam Conway, DOWL
Mechanical Engineer:
Rob James, Cole Breit
Electrical Engineer:
Jason Bethers, Elite Electric
Geo Engineering:
Carlson Testing
Landscape Architect:
Brian Nierman, Szabo Landscape Architecture
Landscaping: Botanical Developments
Subcontractors and Suppliers:
7 Peaks Paving, AM-1 Roofing Inc., Baxter Builders, Bell Hardware, Bend Commercial Glass, Bend Concrete Services, Bend Fireside, Botanical Developments, Castle Bespoke Flooring, Central Oregon Garage Door, Central Oregon Trim & Door, Christensen Plumbing, Dave Gerhardt Tile, Deschutes Concrete Construction, Dimar Siding Company, Eagle Roofing, ECI, Elite Electric, Engineered Wood Solutions, Fabulous Floors, Garage Harmony, GH Surveying, Grizzly Mountain Excavation, Ideal Products, Innotech Windows & Doors, J&R Fire Protection, J&C Standers Construction Supply, J. Helm Enterprises, Lance Douglas Peterson, LDC Inc., Miller Lumber, North Country Building Specialties, Northwest Framing Systems, Northwest Painting & Restoration, Inc, Otis Elevator, Quality Heating, Redbuilt Engineered Wood Products, Roger Langeliers Construction, Scott Harrin Design & Construction, Solid Rock Masonry, Superior Garage Floors, Taylor Northwest, True Line Steel, Ultra Quiet Floors, Western Protective Coatings
Brief Description of Project:
SunWest Builders provided preconstruction and construction services for the construction of two buildings at “The Grove” in NorthWest Crossing. The first building is a 13,780 sq. ft. Market Hall consisting of ten restaurant stalls and a common eating area. The second building is a 18,200 sq. ft. commercial building, which is built to suit for each individual tenant. The project incorporates site improvements within “city block” and will serve as a new gathering area for NorthWest Crossing.

Third Street Marketplace

1219 NE Third St., Bend, OR 97701

Property Owner/Developer: Third Street Marketplace, LLC.
Contractor: SunWest Builders
Sitework Start: November 2, 2020
Completion: June 28, 2021
Square Footage: 7,060 sq. ft.
Amenities: Four-suite commercial shell space with complete site finishes, landscape and drive-thru.
Financing: First Interstate Bank
Project Manager: Kristy Thompson, SunWest Builders
Supervisor: David Mata, SunWest Builders
Architect: Steele Associates Architects
Principal Architect: Andy Harmon, Matti Sjoblom-Chambers, Scott Steele
Structural Engineer: Ashley & Vance Engineering
Civil Engineer: HWA
Mechanical Engineer: ColeBreit Engineering
Plumbing Engineer: Bryan Young Plumbing
Geotechnical Engineer: Wallace Group, Inc.
Landscape Architect: Homeland Design, LLC.
Landscaping: Newport Avenue Landscaping
Subcontractors and Suppliers:
7 Peaks Paving, A+ Cleaning & Sanitation, B2 Concrete Construction, Bend Commercial Glass, Bend Concrete Services, Bryan Young Plumbing, Cascade Insulation, CCI Bend, LLC,, Eagle Roofing, ECI Insulation, Elite Electric, J&RFire, K&R Sheetmetal Inc., Marc Riverman Painting, Newport Ave Landscaping, Northwest Framing Systems, Quality Heating, Roger Langeliers Construction, Shamrock Northwest Construction, Solid Rock Masonry, Sunburst Fabrications, Inc., Western Protective Coatings
Brief Description of Project:

Four-suite commercial shell space with complete site finishes, landscape and drive-thru.

Thompson Elementary School Renovations

437 NW Wall St., Bend, OR 97703

Property Owner/Developer: Bend-La Pine Schools
Contractor: R&H Construction
Project Cost: $4.8M
Sitework Start:
April 2020
Completion:
February 2021
Square Footage:
16,000 sq. ft.
Financing:
Capital construction bond
Project Manager:
Meghan Bowman, R&H Construction
Supervisor:
Matt Butler, R&H Construction
Architect:
Matt Appleby, BBT Architects
Principal Architect: Renee Alexander, BBT Architects
Structural Engineer: Walker Structural Engineering
Mechanical Engineer:
ColeBreit Engineering
Subcontractors and Suppliers:
7 Peaks Paving LLC, A-Core of Oregon LLC, Alpine Abatement Association, Inc, Anderson Clark Interiors Inc, Arbor 1 Tree Service LLC, Bell Hardware, Bend Commercial Glass, Bend Heating & Sheet Metal Inc, CCI Bend LLC, Cement Elegance, Central Oregon Roofing Co, Classic Coverings and Design Inc., Deschutes Painting Inc., Engineered Products a Pape’ Co., Environmental Controls Corp., Fabulous Floors Inc, Green Window Restoration LLC, Johnson Brothers TV & Appliance, LDC Inc, LETS Construction Cleaning, Inc., Mike’s Fence Center Inc, Nationwide Lifts Oregon, Inc., North Country Building Specialties, North Rim Electric LLC, Northwest Framing Systems Inc, Northwest Quality Construction Inc, Performance Insulation & Energy Services Inc, Severson Fire Protection Inc, Severson Plumbing & Mech Inc, Sign Wizards Inc., Smalling Construction, Inc., Springtime Irrigation Inc, Sunburst Fabrications Inc., Ultra Quiet Floors, Vibetech Specialties LLC, We Cut Concrete Inc
Brief Description of Project:
This project included the design of a wide range of renovations to this historic school. The project included restoration of the exterior windows to retain the historic characteristic of the school. Building upgrades include new lighting, an upgraded HVAC system and fire and security systems to district standards.

Watson Hangar

765 SE Salmon Ave., Redmond, OR 97756

Property Owner/Developer: City of Redmond Airport/Empire Construction & Development
Contractor: Empire Construction & Development
Sitework Start: February 2021
Completion: December 2021
Square Footage:
21,000 sq. ft.
Amenities:
Private air hangar
Project Manager: Mark Meredith
Supervisor: Mark Meredith
Architect:
Steele Associates Architects
Architect Team:
Adam Stephen, Brian Clements, Scott Steele
Structural Engineer: Ashley & Vance Engineering
Civil Engineer:
Becon Civil Engineering
Mechanical Engineer: CEA Consulting Engineers
Landscaping:
Springtime Irrigation
Subcontractors and Suppliers:
Elite Electric, Sunset Plumbing, American Sprinkler, Olson Heating, Springtime Irrigation, Wallace Group, Inc.
Brief Description of Project:
Private air hangar at the Redmond Airport.

Share.

About Author

Leave A Reply