SUB-BIDS REQUESTED — Oregon State University – Cascades Campus (OSU-C), Site Infrastructure – East Rim Road, 30% Documents, Bend, OR BIDS DUE: April 6, 2021 at 2:00PM

0

The East Rim Road project is work associated with the Site Infrastructure project currently underway at the OSU Cascades Campus.  The Site Infrastructure is the development of an approximately 16-acres site for the future campus master plan, site improvements related to Edward J. Ray Hall (Academic Building 2), and SW Simpson Ave improvements.  The East Rim Road project replaces an existing road and will connect to a new traffic circle and new emergency vehicle access road that are now under construction.

Construction work being bid out at this time is the Earthwork/Site Utilities scope and the Landscaping/Irrigation scope.  The Earthwork package includes erosion control, site demolition, excavation & grading, trenching & backfill, aggregate paving base, stormwater utilities, and water utilities.  The Landscaping package includes trees, hydroseeding, soil amendments, mulch, and irrigation system.  The Excavation work is scheduled to begin May, 2021 and Landscaping in July, 2021.

BOLI Prevailing Wage Rates will apply to this work.  Bid documents can be accessed at the following link: https://app.buildingconnected.com/public/565395ced928350a00e70b61/
projects/605506e26ce08000ba7c6dd6

SWINERTON BUILDERS

342 SW Second Ave.
Portland, OR 97204
Phone: (503) 224-6888 – Fax: (503) 224-6889
OR # 78483 – WA# SWINEB*992DR

We are an equal opportunity employer and request bids from all interested firms  including disadvantaged, minority, women, veterans and emerging small business enterprises.

Share.

About Author

Founded in 1994 by the late Pamela Hulse Andrews, Cascade Business News (CBN) became Central Oregon’s premier business publication. CascadeBusNews.com • CBN@CascadeBusNews.com

Leave A Reply